期刊文献+

基于FLAC^(3D)的下向进路胶结充填采场参数研究 被引量:15

Parameters of cemented underhand heading stope based on FLAC^(3D) analysis
下载PDF
导出
摘要 采用下向进路胶结充填法的矿山,回采断面尺寸是关系矿山安全生产的重要参数.结合工程实际,采用FLAC3D数值计算软件研究了矩形断面尺寸与采场稳定性的关系,对进路开挖后充填采场应力、位移、塑性区进行了分析.结果表明:进路高度对采场稳定性影响不大,跨度为6 m时采场处于失稳临界状态. The road way section size is very important in cemented underhand heading backfill mining for it relates to mining safety production. This paper studies the relationship between rectangular section size and stope stability using FLAC3D based on practical engineering. The distribution of stresses,displacement,plastic zone are analyzed. The results show that the height of road way has little effect on stope stability. The stope will be in the critical state of instability when the span is 6 m.
出处 《有色金属科学与工程》 CAS 2011年第6期74-78,共5页 Nonferrous Metals Science and Engineering
关键词 胶结充填 数值模拟 断面尺寸 临界状态 cmented filling numerical simulation section size critical state
  • 相关文献

参考文献7

二级参考文献39

共引文献206

同被引文献134

引证文献15

二级引证文献74

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部