积石峡水电站泄洪洞与导流洞交叉段大洞室设计与施工 被引量:2

Design and construction of large cavern in the intersection of spillway tunnel and diversion tunnel for Jishixia hydropower project
下载PDF
导出
摘要 积石峡水电站左岸中孔泄洪洞由导流洞改建而成,泄洪洞与导流洞的交叉段为不对称顶拱的大断面洞室,具有结构受力及地质条件复杂的特点。设计通过采用有限元法确定施工工序,块体理论分析确定支护措施,以及对于不对称顶拱城门洞型断面,采用有限元法与边值法结合的结构配筋计算等方法,有效解决了洞室开挖支护、永久结构设计等难题。 The middle outlet spillway tunnel on the left bank of Jishixia hydropower project is rebuilt from the diversion tunnel, the intersection of the spillway tunnel and diversion tunnel is a cavern with large section and asymmetric crown, characterized by the stressed structure and complex geological conditions. By use of finite element method to determine the construction process, block theory to analyze and determine support measures, and the combined finite element method and boundary value method to calculate the structural reinforcement for the horseshoe section with asymmetric crown, designers effectively salved the problems of tunnel excavation support and permanent structure design.
出处 《西北水电》 2011年第6期27-29,共3页 Northwest Hydropower
关键词 泄洪洞 大断面洞室 结构设计 有限元法 块体理论 边值法 spillway tunnel cavern with large section, structural design finite element method block theory boundary value method
  • 相关文献

二级参考文献4

共引文献10

同被引文献11

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部