3PINTO L M V G,FILHO J F P,PEREIRA M V F.Amodel for the maintenance schedule of an electrical generation /transmission system// Proceedings of IEEE International Symposium on Circuits and Systems:Vol 2,Jun 11-14,1991,Singapore.Piscataway,NJ,USA:IEEE,1991:1216-1219.
4MARWALI M K C,SHAHIDEHPOUR S M.Integrated generation and transmission maintenance scheduling with network constraints.IEEE Trans on Power Systems,1998,13(3):1063-1068.
5LI W,KORCZYNSKI J.A reliability based approach to transmission maintenance planning and its application in BC hydro system.IEEE Trans on Power Delivery,2004,19 (1):303-308.
6REEVES C R.Modern heuristic techniques for combinatorial problems.Oxford,UK:Blackwell Scientific Publications,1993.