摘要 为了弄清石门坎水电站拱坝泄洪消能的能力,通过拱坝泄流能力水工模型试验,分别模拟3个表孔和两个中孔单独或表孔、中孔联合运用条件下泄流能力、出口流速、压力分布及消能冲刷情况。以验证原设计方案中表孔、中孔体型设计是否合理,从而最终确定表孔、中孔的设计体型。模拟泄洪过程中消力池底板的受力情况变化,根据受力情况提出改善措施,防止发生揭底破坏。对泄洪的雾化问题进行简单分析,提出意见。 In order to gain a clear idea of the capability of flood discharging and energy dissipation of the arch dam of the Shimenkan hydropower project, a hydraulic modal test of arch dam flood discharging capability was made to simulate flood discharging capab'dity, outlet flow velocity, pressure distribution, energy dissipation and erosion under individual operation of 3 crest outlets and 2 intermediate outlets or under joint operation of a crest outlet and an intermediate outlet, so that the shapes and con_figurations of the crest outlets and the intermediate outlets in the original design could be verified and finalized. The change of pressure applied on the plunge pool bottom plate during flood discharging was simulated and necessary measures were taken to protect the bottom plat from damage according to the simulation result. A simple analysis was made of atomization caused by flood discharging, and comments on improvelnent were put forward.
出处 《云南水力发电》 2011年第6期19-23,104,共6页 Yunnan Water Power
关键词 石门坎水电站 拱坝 泄流消能 水工模型 溢洪道 arch dam energy dissipation by flood discharging hydraulic model spillway
  • 相关文献

参考文献7

二级参考文献35

共引文献64

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部