分段凿岩阶段空场嗣后充填法在急倾斜破碎矿体中的应用 被引量:10

Application of sublevel drilling open stoping in stage with subsequent filling process in steep and fractured ore-body
下载PDF
导出
摘要 贵州开磷集团用沙坝矿急倾斜破碎矿体属于难采矿体。根据该类矿体的赋存条件,通过对适用的6种采矿方案进行技术经济分析、比较,决定采用分段凿岩阶段空场嗣后充填采矿法。详细介绍了该采矿工艺的结构参数、采准工程、回采工艺及主要技术经济指标。 The steep incline and fractured ore-body in Yongshaba Mine of Guizhou Kinlin Group belongs to difficult-to-mine ore- body. For the sake of this, based on the occurrence of these orebody, six mining methods that can be used are analysed and compared with one another by technical economic analysis. Tile sublevel drilling open stoping in stage with subsequent filling process is decided to be adopted. The paper introduces detailedly the mining process including structure factors, development works and ex traction technology etc..
出处 《化工矿物与加工》 CAS 北大核心 2012年第1期34-37,共4页 Industrial Minerals & Processing
关键词 急倾斜破碎矿体 分段凿岩阶段空场嗣后充填法 采矿方法选择 steep and fractured ore body sublevel drilling openstoping in stage with subsequent filling process option of miningmethod
  • 相关文献

参考文献7

二级参考文献13

共引文献46

同被引文献62

引证文献10

二级引证文献35

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部