期刊文献+

战时装备维修任务调度的两种新算法 被引量:13

Two novel algorithms for equipment maintenance task scheduling in wartime
下载PDF
导出
摘要 针对基于最大保障时间的战时维修任务调度问题,建立了以维修效益最大为目标的调度模型,并给出了两种模型求解算法。算法1以最大保障时间和维修效益作为维修任务的优先级设计参数,充分考虑了维修任务的紧迫性与价值;算法2进一步考虑维修小组的可维修装备数量,使得各小组的维修负载更加均衡。利用该方法,在满足作战单元最大保障时间的前提下,可使得装备维修效益最大,有效地解决了战时维修任务的调度问题。 To the problem of the equipment maintenance task scheduling in wartime based on the most support time,a scheduling model of maximizing of maintenance benefit is proposed,and two algorithms are presented for the model.In the algorithm 1,the most support time and the effectiveness of equipment are adopted as a basis of defining priority for maintenance tasks,which sufficiently considers the urgency and the benefit of the maintenance task.In the algorithm 2,the amount of maintainable equipment is further considered,which makes the maintenance load of each group more balance.With the two algorithms,the maximal maintenance benefit based on most support time can be gotten.Experiments show that the proposed algorithms are valid for maintenance task scheduling in wartime.
出处 《系统工程与电子技术》 EI CSCD 北大核心 2012年第1期107-110,共4页 Systems Engineering and Electronics
关键词 维修 调度 模型 最大保障时间 maintenance scheduling model most support time
分类号 E917 [军事]
  • 相关文献

参考文献15

  • 1Cline R. Maintenance scheduling for mechanical equipment[EB/OL]. United States Department of the Interior Bureau of Reclamation, Den- ver, Colorado. http:// www. usbr. gov/power/data/fist/fist4_la/4 - 1A. pdf.
  • 2Cline R. Maintenance scheduling for electrical equipment[EB/OL]. United states department of the interior bureau of reclamation, Den- ver, Colorado. http://oeww, usbr. gov/ power/data/ist/fist4_lb/ fist4_lb_dec2005, pdf.
  • 3甘茂治 康建设 高崎.军用装备维修工程学[M].北京:国防工业出版社,2001.238-250.
  • 4王荣辉.战时维修任务指派模型研究[C]//应用高新技术提高维修保障能力会议论文集,2005:719-721.
  • 5张芳玉,高崎,何鹏,赵广瑞.战时装备维修任务指派模型及算法研究[J].运筹与管理,2006,15(1):62-65. 被引量:22
  • 6朱昱,宋建社,曹继平,李国防.一种考虑装备维修流程的多维修任务调度[J].系统工程与电子技术,2008,30(7):1366-1369. 被引量:20
  • 7王正元,严小琴,朱昱,宋建社.一种考虑专业的动态维修任务调度的优化方法[J].兵工学报,2009,30(2):252-256. 被引量:27
  • 8朱昱,宋建社,王正元.一种基于最大保障时间的战时装备维修任务调度[J].系统工程与电子技术,2007,29(11):1900-1903. 被引量:24
  • 9Lee L H, Chew E P, Teng S, et al. Multi-objective simulation- based evolutionary algorithm for an aircraft spare parts alloca- tion problem[J]. European Journal of Operational Research, 2008,189(21):476-491.
  • 10Mytakidis T, Vlachos A. Maintenance scheduling by using the bi criterion algorithm of preferential anti-pheromone[J]. Leo nardo Journal of Sciences, 2008,12(16) : 143 - 164.

二级参考文献31

共引文献86

同被引文献141

引证文献13

二级引证文献39

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部