介绍了后浇带是现浇钢筋混凝土结构在施工过程中的一种临时施工缝。根据后浇带设置的侧重,结合在施工过程中的技术特点,对房屋建筑现浇混凝土后浇带的设置和施工技术进行了探讨,并对其在施工流程中的要求进行了总结,以确保后浇带设置合理、施工规范。
Latter-pouring band is a kind of temporary construction joint occurring in construction process of cast-in-situ steel reinforced concrete structure.According to the setting points of latter-pouring band,combining with construction technology features,the paper explores the setting and construction technology of cast-in-situ concrete latter-pouring band,and summarizes the construction requirements,with a view to ensure the latter-pouring band setting rational and construction normal.