2KYUNG N K, JAE-HO C. Breaking the vicious cycle of flood disasters : goals of project management in post-disas- ter rebuild projects [J]. International Journal of Project Management ,2013 (10) : 147-160.
3ELISABETH S. Problems with binary pattern measures for flood model evaluation [ J ]. Hydrological Processes, 2014 (28) :49284937.
4SMITH R A E. Evaluation of a coastal flood inundation model using hard and soft data[ J]. Environmental Model- ing and Software, 2012 ( 30 ) : 35-46.
5HALPIN E. Performance of the New Orleans flood protec- tion system during Hurricane Katrina [ J ]. International Journal on Hydropower and Dams,2006 ( 13 ) :41-49.
6DENG Weiping, ZHOU Jianzhong. Flood disaster evalua- tion model based on kernel dual optimization support vec- tor machine [ J ]. Information Technology Journal, 2013 (12) :2412-2418.