期刊文献+

基于多属性决策的供应链排序问题研究 被引量:1

Research on supply chain scheduling based on multiple attribute decision-making
下载PDF
导出
摘要 文章以生产排序费用和分批发送费用总和最小为排序目标,考虑包含单个供应商向多制造商供应工件的供应链排序问题,并建立了问题的数学模型;提出了一种融合多属性决策方法的动态规划算法,给出了相应算例,并分析了算法的复杂度。 Aiming at minimizing the total cost of production scheduling and segment delivery,a mathematical model of supply chain scheduling is built considering the orders of multi-manufacturers to single supplier.And a dynamic programming algorithm is proposed based on the multi-attribute decision making method.The corresponding examples are given and the complexity of the algorithm is analyzed.
出处 《合肥工业大学学报(自然科学版)》 CAS CSCD 北大核心 2012年第1期130-133,共4页 Journal of Hefei University of Technology:Natural Science
基金 国家自然科学基金资助项目(71171071) 安徽高校省级自然科学研究重点资助项目(KJ2011A215) 中央高校基本科研业务费专项资金资助项目(2011HGQC1000) 合肥工业大学博士学位人员专项基金资助项目(GDBJ2010-001 2010HGBZ0617)
关键词 供应链排序 多属性决策 动态规划 supply chain scheduling multiple attribute decision-making dynamic programming
  • 相关文献

参考文献12

  • 1Thomas D J, Griffin P M. A review of integrated analysis of production-distribution systems [J]. IIE Trans, 1996, 31: 1061--1074.
  • 2Rowe J, Sivayogan J, Codd A, et al. Intelligent retail logiS- tics scheduling[J]. AI Magazine, 1996,17(4) : 31--40.
  • 3Hall N G,Potts C N. Supply chain scheduling: batching and delivery[J]. Operational Research, 2003,51 (4) : 566-- 584.
  • 4Agnetis A, Hall N G,Pacciarelli D. Supply chain schedu- ling: sequence coordination[J]. Discrete Applied Mathe- matics,2006, 154(15): 2044--2063.
  • 5Dawande M, Geismar H N, Hall N G, et al. Supply chain scheduling: distribution systems[J]. Production and Oper- ations Management,2006, 15(2) : 243--261.
  • 6Zegordi S H,Abadi I N K,Nia M A B. A novel genetic al gorithm for solving production and transportation schedu ling in a two-stage supply ehain[J]. Computers & Industri al Engineering, 2010, 58(3) : 373--381.
  • 7Mazdeh M M, Shashaani S, Ashouri A, et al. Single-machine batch scheduling minimizing weighted flow times and deliv- ery costs [J]. Applied Mathematical Modelling, 2011, 35 (1) :563--570.
  • 8柏孟卓,陈峰,唐国春.供应链管理中生产和运输集成的排序问题[J].工业工程与管理,2007,12(5):47-50. 被引量:16
  • 9杨爱峰,冯帅,刘冀琼.考虑运费问题的供应链协调模型研究[J].合肥工业大学学报(自然科学版),2010,33(9):1392-1395. 被引量:1
  • 10陈荣军,唐国春.平行机的供应链排序[J].系统科学与数学,2010,30(2):274-282. 被引量:10

二级参考文献51

  • 1Rowe J, Sivayogan J, Codd A et al. Intelligent retail logistics scheduling. Artificial Intelligence Magazine, 1996, 17(4): 31-40.
  • 2Hall N G, Potts C N. Supply chain scheduling: Batching and delivery. Operations Research, 2003, 51(4): 566-584.
  • 3Agnetis A, Hall N G, Pacciarelli D. Supply chain scheduling: Sequence coordination. Discrete Applied Mathematics, 2006, 54(15): 2044-2063.
  • 4Dawande M, Geismar H N, Hall N G. Supply chain scheduling: Distribution systems. Operations Research, 2007, 47(5): 511-517.
  • 5唐国春.供应链排序的模型和方法.中国运筹学会第八届学术交流会论文集,香港:Global-Link Informatics,2006:495-502.
  • 6柏孟卓,樊保强,唐国春.供应链管理中供应商的排序、分批和发送问题.21世纪中国经济新增长点-现代物流的前沿研究,北京:中国物资出版社,2006.
  • 7Chauhan S S, Eremeev A V, Romanova A A. Approximation of the supply chain scheduling problem. Operations Research Letters, 2005, 33(3): 249-254.
  • 8Chen Z L. Simultaneous job scheduling and resource allocation on parallel machines. Annals of Operations Research, 2004, 129: 135-153.
  • 9Chen Z L, Hall N G. Supply chain scheduling: Conflict and cooperation in assembly systems. Operations Research, 2007, 55: 1072-1089.
  • 10Chen Z L, Vairaktarakis G. Integrated scheduling of production and distribution operations. Management Science, 2005, 51: 614-628.

共引文献32

同被引文献13

  • 1YEUNG W K, CHOI T M, CHENG T C E. Supply chain sc- heduling and coordination with dual delivery modes and inven- tory storage cost[J]. International Journal of Production Eco- nomics, 2011,132 (2) : 223-229.
  • 2KAMINSKY P, KAYA O. Inventory positioning, scheduling and lead time quotation in supply chains[J]. International Jour- nal of Production Economics, 2008,114 (1) : 276-293.
  • 3HALL N G, LIU Zhixin. Capacity allocation and scheduling in supply chains [J]. Operations Research, 2010, 58 (6): 1711-1725.
  • 4SAWIK T J. Multi-objective master production scheduling in make-to-order manufacturing[J]. International Journal of Pro- duction Research, 2007,45 (12) : 2629-2653.
  • 5NIKANDISH N, ESHGHI K. Integrated procurement, pro- duction and delivery scheduling in a generalized three stage supply chain[J]. Journal of Industrial and Systems Engineer- ing,2009,3(3) :189-212.
  • 6YAO Jianming, LIU Liwen. Optimization analysis of supply chain scheduling in mass customization [J]. International Journal of Production Economics,2009,117(1) : 197-211.
  • 7KARIMI N, DAVOUDPOUR H. A branch and bound meth od for solving multi-factory supply chain scheduling with batch delivery[J]. Expert Systems with Applications, 2014,41 (1) :8027-8048.
  • 8常桂娟,张纪会.带运输时间的无等待供应链在线调度问题研究[J].控制与决策,2008,23(10):1092-1097. 被引量:2
  • 9王建华,李南,郭慧.敏捷供应链静态调度模型及其贪婪算法[J].计算机应用,2010,30(3):846-849. 被引量:5
  • 10王建华,李南,郭慧.基于时间槽的敏捷供应链集成调度模型及优化[J].系统工程理论与实践,2011,31(2):283-290. 被引量:9

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部