摘要
天山·米立方是大型室内水上综合型工程项目。根据建筑功能要求,在门厅和戏水区间跨越室内独立结构A、B座设置点支式玻璃幕墙,门厅处在10.0m高度设置走廊以连接A、B座。结合玻璃幕墙结构特点以及走廊的受力特性和构造要求,提出双肢柱、单肢柱两种支承方案。在相同荷载技术条件下,根据有限元计算结果,从杆件应力﹑支座反力﹑变形以及用钢量等方面进行分析比较,综合评定后选用单肢柱方案。建立了有限元整体模型,分析了玻璃幕墙结构在各种荷载工况下的应力和变形等基本静力性能以及关于特征值的基本动力特性。
Tianshan · Milifang is a large indoor water comprehensive engineering project. According to the function requirements, the point supporting glazing full curtain wall is selected across the indoor independent structure A, B between the hallway and the paddle areas. At the height of 10 meters in the hallway, a corridor is set up to connect A and B. Combining the glass curtain wall structure characteristics and the stress characteristics of corridor and tectonic requirements. Two supporting column schemes were put forward, that is: double limb column and single limb column . In the same load technology conditions, according to the finite element calculation results,the single limb column option is adopted depending on the comparison of rods stress, support reaction, deformation, and economy. Finite element analysis of the glass curtain wall is carried out, the static performance under each load case and the basic dynamic performance are studied.
出处
《建筑钢结构进展》
北大核心
2012年第1期27-32,共6页
Progress in Steel Building Structures
基金
教育部新世纪优秀人才支持计划(NCET-06-0228)
关键词
点支式玻璃幕墙
单肢柱
双肢柱
静力性能
动力特性
point-supporting glazing full curtain wall
single limb column
double limb column
static behavior
dynamic property