摘要
为进一步研究分布式能源冷热电联供系统并网问题,以广西A区冷热电联供系统为例,在对A区进行必要的负荷预测及电力平衡分析的基础上,分析了机组的出力消纳方向,提出机组接入系统方案,并进行必要的电气计算及投资估算。
In order to further study the grid connection of distributed combined supply system of cooling, heating and electric power, the paper takes the three-combined supply system of A-area in Guangxi for example. On the basis of necessary balance of load forecast and analysis of electric power balance, the accommodation direction of units is analyzed and the connections design is proposed with necessary electrical calculation and investment estimation.
出处
《红水河》
2011年第6期12-14,共3页
Hongshui River
关键词
冷热电联供系统
接入系统
并网
combined supply system of cooling, heating and electric power
connection system
grid connection