平煤二矿新风机挂网前后系统优化改造 被引量:1

Optimization Transformation for New Fan System Before and After Hanging in Pingdingshan Coal Group No.2 Coal Mine
原文传递
导出
摘要 为确保平煤二矿三水平回风井挂网前后通风困难时期各用风地点风量充足、通风系统稳定及主要通风机合理、稳定的运转,对矿井通风系统进行技术测定,提出了矿井通风系统优化改造方案。利用计算机对各个方案进行解网分析后。 To ensure that the enough air used by different site,ventilation system stable and main fan reasonable and stable operation during difficult period before and after hanging in the three level return air wells,for mine ventilation system technological measurement,the paper put forward mine ventilation system optimization and transformation schemes.Using the computer solution nets analysis for each plan,the paper finally determined ventilation system optimization reconstruction scheme before and after three level fan hang nets.
出处 《煤矿安全》 CAS 北大核心 2012年第1期129-132,共4页 Safety in Coal Mines
关键词 系统优化 解网分析 改造 system optimization network analysis solution transformation
  • 相关文献

参考文献5

共引文献58

同被引文献2

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部