1Jayaram,an V,Guide V and DR, Srwastava R,1999,A closed-loop logisticsm odd for Remanufacturing[J].Journal of the operational Research Sociaty,50:497-508.
2Geraldo,Ferrer,2006,Managing New and Remanufactured Products[J].Manage- merit Science,52(1).
3Savaskan,R.C and Bhattacharya S.W and assenhove LV,2004,Closed-loop supply chain model with'product remanfacturing [J].Management Science,50(2):239-252.
4Laurens,G Debo,2005,Market seg- mentation and product technology selecton for remanfacturable product[J].Management Science,51(8):1193-1205.
8[1]Ginsburg J.Manufacturing:Once is not enough[J].Business Week,2001,(16):128-129.
9[2]Fleischmann M,Krikke H R,Dekker R,Flapper SDP.A characterization of logistics networks for product recovery[J].Omega,2000,28(6):653-666.
10[3]Guide V D R,Jayaraman V,Linton J D.Building contingency planning for closed-loop supply chains with product recovery[J].Journal of Operations Management,2003,21(3):259-279.