摘要 隔水管悬挂窗口为允许隔水管进行悬挂作业的环境载荷极值条件,钻前形成悬挂窗口对于指导隔水管现场作业至关重要。提出隔水管软、硬悬挂模式作业窗口分析方法,建立隔水管轴向动力分析有限元模型,基于隔水管悬挂作业限制准则,进行不同海况条件下的隔水管悬挂窗口研究。波高周期作业窗口分析表明,隔水管硬悬挂窗口受平台升沉运动与波浪周期共同影响,波浪周期在10~16s、20~24s之间的作业窗口较窄,硬悬挂自存时推荐平台艏向取45°浪向角;隔水管软悬挂窗口主要受伸缩节冲程限制,不同浪向角下的作业窗口基本相同。波浪海流作业窗口分析表明,海流流速越大隔水管悬挂允许的最大波高越小。对比两种悬挂模式下的作业窗口,软悬挂模式较大地扩展了隔水管的悬挂作业窗口。 The riser hang-off window is an extremum condition of environmental load to allow the riser hang-off operation,which is essential to the field operation.Here we put forward a method to analyze operating windows for soft or hard hang-off modes of the riser,which includes to establish a finite-element model for the riser axial dynamic analysis and to examine riser hang-off windows under different oceanic conditions based on the restraint criterion of riser hang-off operations.Analyses of operating windows of wave height and periods show that the hard hang-off window is jointly affected by the vessel heave movement and wave periods,and it gets narrower when the wave period falls into a range of 10~16s or 20~24s.The recommended vessel heading for the hard hang-off mode survival in case of extreme weather should be at a 45° wave direction angle.The soft hang-off window is restricted mainly by the telescopic joint stroke and it keeps approximately identical,independent of the wave direction angle.Analyses of operating windows of wave and oceanic current indicate that the maximum allowable wave height for the riser hang-off operation gets smaller when the oceanic current velocity increases.A comparison of operating windows between the two hang-off modes shows that the soft hang-off mode can significantly expand the riser hang-off operating window.
出处 《石油学报》 EI CAS CSCD 北大核心 2012年第1期133-136,共4页 Acta Petrolei Sinica
基金 国家重大科技专项"深水钻完井工程技术"(2011ZX05026-001) 国家自然科学基金项目(No.50904078) 中央高校基本科研业务费专项资金资助项目(09CX05008A)资助
关键词 深水 钻井隔水管 悬挂 轴向动力分析 作业窗口 deepwater drilling riser hang-off axial dynamic analysis operating window
  • 相关文献

参考文献10

  • 1孙友义,陈国明.超深水钻井系统隔水管波致疲劳研究[J].石油学报,2009,30(3):460-464. 被引量:18
  • 2Brekke J N, Soles J, Wishaby M A. et al.Drilling riser management for a DP drillship in large, rapidly developing seastates in deepwater:Proceedings of the 2004 IADC/SPE Drilling Conference. Dallas. March 2 4.2004[C]. Dallas : SPE. 2004.
  • 3Steddum R. The management of long. suspended strings of tubuars from floating drilling vessels: Proceedings of the 2003 Off shore Technology Conference, Houston, May 5 8. 2003 [C].Houston : OTC, 2003.
  • 4Sullivan E O. Brekke J N, Dib M. Riser deployment and hang off A natysis for a harsh environment:Proceedings of OMAE04 23rd Inter nalional Confercncc on Offshorc Mechanics and Arctic Engineering. Vancouver,June 20-25,2004[C]. Vancouver:OMAE,2004.
  • 5Kazuaki I.Kenkichi T,Katsuya M.et al. Behavior characteristics of hang off riser that considers oscillation of floating structure: Proceedings of OMAE2006 25th International Conference on Offshore Mechanics and Arctic Engineering. Hamburg,June 4-9. 2006[C]. Hamburg:OMAE,2006.
  • 6戴伟,高峰,白勇.操作与悬挂工况下的深海立管有限元分析(英文)[J].Journal of Marine Science and Application,2009,8(2):156-162. 被引量:9
  • 7Amhrose B D.Grealish F,Whooley K. Soft hangoff method for drilling risers in uhra deepwater: Proceedings of the 2001 Off. shore Technology Conference. Houston. April 30-May 3. 20111 [C], Houston : OTC. 2001.
  • 8Sparke C P. Fundamentals of marine risers mechanics[M]. Tulsa:PennWell Corp,2007:199 -203.
  • 9American Petroleum Institute. API RP 16Q-1993 Recommended praclice for design selection operation and maintenance of marine drilling riser system[S]. Washington: American Petroleum Institute, 1993.
  • 10International Organization .for Standardization. ISO 13624-1-2007 Petroleum and nalural gas industries-Driliing and production equipment Part 1:Design and operation of marine drilling riser equipment[S]. Geneva: International Organization for Standardization ,2007.

二级参考文献13

  • 1谢彬,张爱霞,段梦兰.中国南海深水油气田开发工程模式及平台选型[J].石油学报,2007,28(1):115-118. 被引量:92
  • 2Shu H, Loeb D A. Extending the mooring capability of a mobile offshore drilling unit:Proceedings of the 2006 Offshore Technology Conference, Houston, USA, May 1-4, 2006 [C]. Houston, USA : OTC, 2006.
  • 3Dove P, Weisinger D, Abbassian F. The development and testing of polyester moorings for ultradeep drilling operations: Proceedings of the 2000 Offshore Technology Conference, Houston, USA,May 1-4,2000[C]. Houston,USA:OTC,2000.
  • 4Ormberg H, Larsen K. Coupled analysis of floater motion and mooring dynamics for a turret-moored ship[J]. Applied Ocean Research, 1998,20(1/2) :55-67.
  • 5Ye W, Shanks J, Fang J. Effects of fully coupled and quasi-static semi-submersible vessel motions on steel eatenary riser's wave loading fatigue: Proceedings of the 2003 Offshore Technology Conference, Houston, USA, May 5 - 8,2003 [C]. Houston, USA : OTC, 2003.
  • 6Hansen V L, Wang L H, Sodahl N. Guidelines on coupled analyses of deepwater floating systems:Proceedings of the 2004 Offshore Technology Conference, Houston, USA, May 3-6,2004[C]. Houston, USA : OTC, 2004.
  • 7Low Y M,Langley R S. Time and frequency domain coupled analysis of deepwater floating production systems[J]. Applied Ocean Research,2006,28(6) :371-385.
  • 8BAI Yong, BAI Qiang. Subsea pipelines and risers[M]. Amsterdam: Elsevier Science Ltd, 2005.
  • 9American Petroleum Institute. API RP 16Q Recommended practice for design, selection, operation and maintenance of marine drilling riser system[S]. Washington, D C: API Publishing Services, 1993.
  • 10American Petroleum Institute. API RP 2RD Design of risers for floating production systems (FPSs) and tension-leg platforms (TLPs)[S]. Washington, D C: API Publishiflg Services, 1998.

共引文献25

同被引文献243

引证文献31

二级引证文献188

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部