乌江索风营电站厂房尾水水位流量关系的复核

Check of tail - water flow relationship of powerhouse of Suofengying Hydropower Station on Wujiang River
原文传递
导出
摘要 索风营电站自2005年投产发电以来,未进行过厂房尾水处河道清理工作。本文通过2007年、2008年索风营电站与下游乌江渡电站实测水位、流量资料对索风营电站厂房水位流量关系进行复核,以了解运行以来厂房尾水处河道的冲淤情况。 Since Suofengying Hydropower Station put into operation, the river of the powerhouse tail - water has not been cleaned. The paper checks the powerhouse tail - water flow relationship of Suofengying Hydropower Station according to the recorded water level and flow information of Suofengying Hydropower Station and Wujiangdu Hydropower Station on the downstream in 2007 and 2008, so as to know the situation of the fiver rushing or silting deposits of the powerhouse tail - water since in the production.
作者 李悦
出处 《水电勘测设计》 2011年第1期28-31,38,共5页
关键词 乌江索风营电站 厂房尾水处 水位流量关系 河道冲淤 Suofengying Hydropower Station on Wujiang River powerhouse tail -water tail -water flow relationship river rushing or silting deposits
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部