箱子岩水电站是贵阳院近期设计建成的一座闸坝式水电站,具有泄洪水头低、泄量大,发电水头小、引用流量大的特点,电站采用灯泡式发电机组,厂房基础下卧软弱夹层,本文介绍了电站各建筑物的布置及工程基础处理措施。
Xiangziyan hydropower project is completed recently, which is designed by our institute. The project has the characteristics of low flood discharging head, large discharging flow, low power head and large usable flow. The bulb unit is used in the project. There are weak intercalated beds below the powerhouse foundation. The paper introduces the arrangement of each structure of Xiangziyan hydropower project and the measurements of engineering foundation treatment.
关键词
基础处理
灯泡式机组
发电厂房
泄洪闸
枢纽
箱子岩水电站
foundation treatment
bulb unit
powerhouse
spillway gate
complex
Xiangziyan hydropower project