摘要
本文通过对某型舰主机基座安装技术要求及工艺难点进行综合分析,并对该型舰主机基座安装阶段前移的可行性进行了研究。
This paper studies the feasibility on advancing the time of installing main engine foundation for a certain naval vessel after a comprehensive analysis of the workmanship to be desired in the installation.
出处
《广东造船》
2011年第6期55-56,共2页
Guangdong shipbuilding
关键词
某型舰
主机基座
风险因素
工艺措施
A certain naval vessel
Main engine foundation
Risk factor
Technological measure