结合双岭电站流道施工难度较大的实际情况,介绍翻转式钢木组合模板在水电站流道施工中的应用,重点介绍该模板的设计思路及安装要点。实践证明,该模板既节约材料又缩短工期,效果显著。
Combined with the construction difficulty of Shuangling Hydropower Project,an introduction was made on the application of turn-over steel-wood composite formwork in water passage construction,with emphasis put on the design idea and key erection issues of formwork.As demonstrated by practice,this kind of formwork renders less material consumption and shorter construction period.
出处
《广西水利水电》
2011年第6期31-33,49,共4页
Guangxi Water Resources & Hydropower Engineering
关键词
水电站流道
翻转
钢木组合模板
施工
Water passage of hydropower project
turn-over
steel-wood composite formwork