摘要
结合江西山口岩水利枢纽工程碾压混凝土双曲拱坝采用翻转大钢模施工的成功经验,对翻转大钢模应用于双曲拱坝的施工思路、施工工艺进行简要介绍。
Turn-over large steel formwork had been successfully applied during RCC double-curvature arch dam construction of Shankouyan Hydraulic Complex located in Shanxi Province. Combined with the experience, a brief introduction was made on the construction idea and technique.
出处
《广西水利水电》
2011年第6期34-35,共2页
Guangxi Water Resources & Hydropower Engineering
关键词
双曲拱坝
翻转大钢模
施工
Double-curvature arch dam
turn-over large steel formwork
construction