摘要
双岭电站堰面采用近似折线型,在施工中如何保证堰面曲线精度是一个至关重要的问题,介绍了在施工中采取定型模、定型桁架、拉模和人工抹面的施工方法。
The weir surface of Shuangling Hydropower Project is design as approximate broken crest.It is very important to keep accurate weir surface curvature during construction.An introduction was made on the construction methods such as type formwork,type truss,draw formwork and artificial plastering.
出处
《广西水利水电》
2011年第6期44-45,共2页
Guangxi Water Resources & Hydropower Engineering
关键词
堰面
定型模
定型桁架
拉模
人工抹面
双岭电站
Weir surface
type formwork
type truss
draw formwork
artificial plastering
Shuangling Hydropower Project