自平衡试验在武汉光谷中心项目工程中的应用分析

Applied Analysis of Self-balancing Test in the Project of Wuhan Optical Valley
下载PDF
导出
摘要 本文结合武汉光谷中心项目工程的实例,详细介绍了在该工程中自平衡试验的原理和具体操作过程,并根据自平衡试验所得的数据,分别采用技术规程公式和等效转换曲线两种方法对桩基的承载力进行了分析研究,结果表明通过自平衡试验能够有效且精确地得到建筑物试桩承载力数值,可为建筑物的设计和施工提供依据;另外,对现阶段利用自平衡试验检测桩基承载力的方法提出了建议,对现阶段桩基检测以及自平衡测试技术的理解和研究具有一定的意义。 In combination with the project in Wuhan Optical Valley, this paper describes in detail the application of the principle and operation of self-balancing test. With the data from the test, the paper analyzes and studies the capacity of file by two methods:technique prescription formula and equivalent conversion curve. The results show that the capacity of pile can be obtained effectively and accurately with self balancing test and thus facilitates the design and construction of the building , In addition, the paper gives some reasonable advices to the method which have certain significance for the current test of pile and for the understanding and research of self-balancing test.
出处 《安全与环境工程》 CAS 北大核心 2012年第1期108-111,共4页 Safety and Environmental Engineering
关键词 自平衡试验 桩基 承载力 武汉光谷中心项目 self-balancing test pile capacity project of Wuhan Optical Valley
  • 相关文献

参考文献2

  • 1DGJ32/TJ77-2009.基桩自平衡法静载试验技术规程[S].南京:江苏省建设厅审定发布,2009.
  • 2JGJ106-2003.建筑基桩检测技术规范[S].[S].,..

共引文献466

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部