摘要 随钻扩眼过程中扩眼器与领眼钻头的钻压分配关系对扩眼钻进工作状态具有重要影响。传统计算方法仅考虑扩眼器与领眼钻头的几何结构因素,精度不高,难以合理指导工具设计。为此,在充分考虑岩石特性、钻具切削结构双参数的基础上,提出一种计算随钻扩眼钻压分配关系的双因素法,以分析各因素对钻压分配的影响规律。理论计算表明,扩眼钻压比与扩眼器钻遇岩层强度成正比,与扩眼刀翼锐度成反比。这一结果与文献的试验结果基本一致,可用于指导随钻扩眼装置的设计和应用。 The weight distribution relation between reamer and pilot bit in the process of reaming while drilling has remarkable effect on the operating condition of reamer drilling.The traditional calculation method considers only the geometric structure of reamer and pilot bit.Thus the calculation is not very precise and it is not suitable for guiding the design of tools.Therefore,a kind of double-factor method for working out the bit weight distribution relation was introduced on the basis of fully considering the parameters of both rock property and cutting structure of drilling tool.The law of the effect of the factors on the bit weight distribution was analyzed.The theoretical calculation shows that the reaming bit weight ratio is directly proportional to the strength of the rocks drilled by the reamer and it is inversely proportional to the sharpness of reamer blade.This finding is basically in agreement with the experimental result introduced in the relevant literature.
出处 《石油机械》 北大核心 2012年第1期26-28,36,共4页 China Petroleum Machinery
基金 国家863计划项目"套管钻井技术"(2006AA06A107) 中国石油集团公司科技项目"车载小井眼套管钻井专用钻机研制"(2008C-2003)
关键词 随钻扩眼 钻压分配 双因素法 岩层强度 扩眼刀翼 锐度 reaming while drilling,bit weight distribution,double-factor method,rock strength,reamer blade,sharpness
  • 相关文献

参考文献10

  • 1Wu S X, Paez L, Partin U, et al. Deeoupling stickslip and whirl to achieve breakthrough in drilling performance [R] . IADC/SPE 128767, 2010.
  • 2Dupriest E F, Sowers F S. Maintaining steerability while extending gauge length to manage whirl [ R ] . SPE/ IADC 119625, 2009.
  • 3Bailey J R, Biediger E A O, Gupta V, et al. Drilling vibrations modeling and field validation [ R ] . IADC/ SPE 112650, 2008.
  • 4Barton S, Weeden R. Accurate matching of bit and reamer tools delivers optimized drilling performance [ R ] . SPE 132057, 2010.
  • 5管志川,魏文忠,夏焱.随钻扩眼工具井底钻压分配的实验研究[J].中国石油大学学报(自然科学版),2007,31(6):44-47. 被引量:11
  • 6夏炎.随钻扩眼工具结构及与之相匹配的钻具组合设计方法研究[D].东营:中国石油大学(华东),2006.
  • 7Teale R. The concept of specific energy in rock drilling [ J ] . International Joumal of Rock Mechanics and Mining Science, 1965 (2) : 57 -73.
  • 8Caicedo H U, Calhoun W M. Unique ROP predictor using bitspecific coefficient of sliding friction and teehanical efficiency as a function of confined compressive strength impacts driUing performance [ R ] . SPE/ IADC 92576, 2005.
  • 9Warren T M, Brett J F, Sinor L A. Development of a whirlresistant Bit [ R] . SPE 19572, 1990.
  • 10Thomson L, Radford S, Powers J, et al. A systematic approach to a better understanding of the concentric holeopening process utilizing drilling mechanics and drilling dynamics measurements recorded above and below the reamer [R] . SPE 112647, 2008.

二级参考文献6

  • 1DAVE Rodman, THOMAS Wong, ADRIAN C Chong. Steerable hole enlargement technology in complex 3D directional wells[ R]. SPE 80476,2003.
  • 2MORRISON W, BAGGAL Z, BAXENDALE B, et al. Optimizing wellbore design using solid expandable tubular and bi-center bit technologies[ R]. SPE92886,2005.
  • 3CHARLRS D Whitson, MICHAEL K Mcfadyen. Lessons learned in the planning and drilling of deep, subsalt wells in the deepwater Gulf of Mexico[ R]. SPE 71363,2001.
  • 4DAVE Rodman. Near-bit reamer allows underreaming while drilling with steerable systems [ J ]. JPT, 2001,53 ( 1 ) :20-21.
  • 5Maggie Lee,申守庆.美国十大钻头公司的十大钻头新技术[J].国外油田工程,2002,18(7):14-20. 被引量:5
  • 6管志川,靳彦欣,王以法.直井底部钻柱运动状态的实验研究[J].石油学报,2003,24(6):102-106. 被引量:58

共引文献12