摘要
分析2011年日本东北近海地震—海啸致福岛核电灾难,发现有严重不符IEC 61508风险-SIL准则的多处"冒险点"。结论:决策失误来自忽视基础技术的部门垄断。
2011,3,11 Fukushima Nuclear Disaster by East Coast Quake-Tsunami in Japan is analyzed based on the analysis "hazard points" of seriously mismatching the Risk-SIL Std of IEC 61508. The conclusion is that the missteps are made by the Monopolies and ignoring basic technologies.
出处
《中国仪器仪表》
2011年第11期32-41,共10页
China Instrumentation