期刊文献+

厚大球铁铸件铸造工艺探讨 被引量:8

A Discussion on the Casting Method of Heavy Nodular Iron Castings
下载PDF
导出
摘要 介绍了风电产品铸件的技术要求,指出:设计合理的浇注系统可以有效地解决夹渣问题,还有利于铸件补缩;小冒口生产成本低于一般的冒口工艺,工艺出品率大大提高,而工艺稳定性则高于无冒口铸造工艺;利用冷铁改变铸件冷却速度则有利于解决石墨漂浮和碎块状石墨缺陷,但要慎用冷铁,尤其是高牌号球铁铸件。 The quality requirement for the wind power castings was introduced.It was pointed out that rational gating system made it possible not only to effectively prevent the dross defect and also improve the casting feeding.The casting method with small risers could reduce the productive cost and increase the process yield rate,compared with the method using big riser,and,in addition,it could increase the casting quality stability compared with using the riser-less method.The usage of chills should be careful,especially for the high grade nodular iron castings,however,using chills to change the casting cooling rate would be helpful to prevent graphite floatation and chunk graphite formation.
作者 杭家友
出处 《现代铸铁》 CAS 2011年第6期43-47,共5页 Modern Cast Iron
关键词 厚大球铁件 浇注系统 冒口 冷铁印迹 石墨漂浮 heavy section nodular iron casting gating system riser chill print graphite floatation
  • 相关文献

同被引文献50

引证文献8

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部