期刊文献+

细长型井口回接连接器设计 被引量:5

Design of Slim Wellhead Tieback Connector
下载PDF
导出
摘要 井口回接连接器是顶部张紧立管的重要组成部分,对维持垂直通道的完整性有重要作用。介绍了细长型井口回接连接器的结构、工作原理、主要技术参数和原理样机的制造;计算了锁紧力和关键部件的强度。设计的细长型井口回接连接器用于连接顶部张紧立管和水下井口,具有尺寸小、安装方便、操作安全可靠等优点,适用于多种浮式平台,尤其是SPAR平台。 Wellhead connector is an important part of a top tensioned riser and plays a very important role in maintaining the integrity of the vertical access.In this paper,the general design and main components of the slim wellhead connector are provided;the working principle and technical parameters of the connector are introduced;the development of prototype is presented;the primary analysis and calculation are made;and the characteristics of the connector are discussed.The slim wellhead tieback connector provided is used for connecting a top tensioned riser and a subsea wellhead.The connector provided,which has many advantages like small size,convenient installation and reliable operation and so on,can be used for TTRs on several kinds of platforms,especially the SPAR platform.
出处 《石油矿场机械》 2011年第12期29-32,共4页 Oil Field Equipment
基金 国家高技术研究发展计划(863计划)专项经费资助(2008AA09A105-01)
关键词 浮式开采平台 井口连接器 结构 技术指标 floating production platform wellhead connector structure technical index
  • 相关文献

参考文献6

  • 1赵洪山,刘新华,白立业.深水海洋石油钻井装备发展现状[J].石油矿场机械,2010,39(5):68-74. 被引量:45
  • 2O' Sullivan E J, Shilling R B, Conair A D, et al. Horn Mountain Spar Risers--Evaluation of Tension and In- stallation Requirements for Deepwater Dry Tree Risers [C]//Houston:Offshore Technology Conference,2003.
  • 3Skeels H B,Johnson J B,Koleilat B M,et al. Develop ment ofa Novel Tieback Connector with High Me chanical Strength Capacity for Spar Floating Produc tion Facilities and Their Production Risers[C]//Hous ton : Offshore Technology Conference,1997.
  • 4钢铁材料手册总编辑委员会.钢铁材料手册:第8卷[K].北京:中国标准出版社,2004.
  • 5兰洪波,张玉霖,菅志军,许朝辉.深水钻井隔水管的应用及发展趋势[J].石油矿场机械,2008,37(3):96-98. 被引量:18
  • 6张宗峰,袁姗姗,张立平.隔水管快速接头有限元分析[J].石油矿场机械,2009,38(6):42-44. 被引量:13

二级参考文献20

  • 1刘海霞.深海半潜式钻井平台的发展[J].船舶,2007(3):6-10. 被引量:40
  • 2中国船级社.海上固定平台入级与建造规范(1992)[S].北京:人民交通出版社,1992.
  • 3SY/T 10030-2004,海洋固定平台规划、设计和建造的推荐作法[S].
  • 4Munch-S egaard L,Nergaard A.Offshore Drilling Experience with Dual Derrick Operations[R].SPE 67706.
  • 5Avelar C S,Santos O L A,Ribeiro P R.Well control aspects regarding slender well drilling with surface and subsea BOP[R].SPE 94852,2005.
  • 6Mark Childers.Surface BOP,slim rise or conventional 21-inch riser-what is the best concept to use[R].SPE/IADC 92762,2005.
  • 7John Kozicz.Surface BOP-recent experience and future opportunities[R].SPE/IADC 103754,2006.
  • 8廖谟圣,杨本灵.世界石油设备发展的新特点及机遇与挑战[J].石油矿场机械,2007,36(9):1-6. 被引量:40
  • 9Guesnon J, Galliard C, Richard F. Ultra Deep Water Drilling Riser Design and Relative Technology[J]. Oil and Gas Science and Technology-Rev. IFP, 2002, 57 (1) :39-57.
  • 10Peuvedic J P,Guesnon J ,Soleille L M. A Fast Coupling for a Deepwater Drilling Riser[R]. SPE 13153.

共引文献69

同被引文献30

  • 1陈家庆.海洋油气开发中的水下生产系统(一)[J].石油机械,2007,35(5):54-58. 被引量:53
  • 2FMC . FMC Technologies subsea tree connections[Z]. 2007.
  • 3Zeiner Gundersen D H. Evaluation of a subsea tree af-ter 20 years' production [C]// Houston: OffshoreTechnology Conference, 1984-05-01-09.
  • 4Otto Granhaug,John Soul. The garden banks 388 hori-zontal tree design and development[C]// Houston : Off-shore Technology Conference,1995-05-01-04.
  • 5Eric D Larson P E,Kevin G Keosoff. Marginal subsea de-velopment with existing subsea trees[C]// Houston {Off-shore Technology Conference, May 2004-05-03-06.
  • 6Fletcher A,Pzrze I. Modularization of Trees [C]// Hous-ton: Society for Underwater Technology ,1987-06-10.
  • 7Kelly T P’Theiss D,H. Rationale for Sealing Systemsfor Subsea Production Systems [C]//Houston: Off-shore Technology Conference, 1989-05-01-04.
  • 8Glidden G L,Singeetham S P. Improved Wellhead Con-nector Design-Preload Production and Maintenance[C]// Texas: Offshore Technology Conference,1984-05-07-09.
  • 9ISO13628-4 Petroleum and natural gas industries-de-sign and operation of subsea production systems-part4; subsea wellhead and tree equipment[S]. 2004.
  • 10金向东,林华春,等.海上油气田水下生产系统的关键设备和技术[J].油气田地面工程,2011,(13):12-17.

引证文献5

二级引证文献40

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部