摘要 该文通过对坝体砂砾料填筑采用ρd-P5-Dr三因素相对密度质量控制和坝体壤土防渗斜墙采用干密度质量控制,严格执行建设监理监督机制,达到优质工程质量的实例,经5 a安全运行检验,取得了显著的经济效益和社会效益。该项技术可为类似条件的工程开发建设的质量控制,提供参考和借鉴。 The article introduces the quality control of filling and pouring the grit of dam with the relative densities of three factors ρd-P5-Dr and the quality control of the dam soil preventing the inclined wall from seepage with the dry density,the strictly implemented supervision system of construction,and the practical cases of the projects up to the high quality.The obvious economic benefit and social benefit are achieved by the inspection test of safe operation for five years,which can be referred for the quality control of the similar engineering development and construction.
作者 樊伟东
出处 《城市道桥与防洪》 2011年第12期94-97,8+7,共4页 Urban Roads Bridges & Flood Control
关键词 康扬水电站 坝体填筑 相对密度 干密度 质量控制 Kangyang Hydropower Station,dam filling and pouring,relative density,dry density,quality control
  • 相关文献

参考文献4

  • 1水利工程施工[M].北京:中国水利水电出版社,2007.
  • 2SLl76—2007,水利水电工程施工质检验与评定规程[S].
  • 3SL223-2008,水利水电建设工程验收规程[S].
  • 4水利水电基本建设工程单元工程质量等级评定标准,第一部分:土建工程[S].

共引文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部