摘要 采用氧气顶吹熔融还原法进行了高磷铁矿和钛铁矿混合矿炼铁的实验研究,考察了熔渣四元碱度、反应温度、碳氧摩尔比、通氧时间、保温时间和氧流量对炼铁效果的影响.结果表明,提高反应温度、在一定范围内增加CaO加入量、提高碳氧摩尔比、延长通氧时间和保温时间、增加氧流量都能不同程度地提高铁还原率.确定的合理工艺条件为:温度1500℃,碱度1.3,碳氧摩尔比1.0,保温时间30 min,通氧时间10 min,氧流量350 L/h,在此条件下渣铁分离较好,铁还原率达96.17%. The ironmaking process of oxygen top-blown smelting reduction from high phosphorus iron ore mixed with ilmenite was studied. The experiments were conducted to investigate the effects of slag basicity,temperature,molar ratio of carbon to oxygen,oxygen-blowing time,holding time and oxygen flow rate on iron recovery rate. The experimental results showed that the iron recovery rate increased with increasing of smelting temperature,content of CaO added,molar ratio of carbon to oxygen,oxygen-blowing time,holding time and oxygen flow rate within a certain range. The slag and iron were well separated and iron recovery rate was up to 96.17% under the conditions of holding time of 30 min at 1500℃,slag basicity of 1.3,molar ratio of carbon to oxygen of 1.0,oxygen-blowing time of 10 min and oxygen flow rate of 350 L/h.
出处 《过程工程学报》 CAS CSCD 北大核心 2011年第6期1024-1029,共6页 The Chinese Journal of Process Engineering
基金 国家自然科学基金资助项目(编号:51064015) 云南省教育厅重点资助项目(编号:ZD2010001)
关键词 高磷铁矿 钛铁矿 熔融还原 炼铁 high phosphorus iron ore ilmenite smelting reduction ironmaking
  • 相关文献

参考文献14

二级参考文献43

  • 1刘文运,王学峰.HIsmelt工艺及技术[J].鞍钢技术,2004(3):16-19. 被引量:10
  • 2周渝生.煤基熔融还原炼铁新工艺开发现状评述[J].钢铁,2005,40(11):1-8. 被引量:35
  • 3杨勇,宋波,杨素波,文永才,何为.CaO-SiO_2-Al_2O_3-MgO-V_2O_5渣系中钒熔融还原动力学[J].北京科技大学学报,2006,28(12):1115-1120. 被引量:1
  • 4Gupta S K, Tandon J K, Gupta S S. Innovative steelmaking technology through Corex process at Jindal Vijayanagar Steel Limited. J Mines Met Fuels, 2003, 51(4) : 164
  • 5Goldsworthy T E, Dry R J, Bates C P, et al. Hismelt-the alternative technology for iron making. ,SEAISI Q, 2000, 29(2) : 43
  • 6Kumar P P, Garg L M, Gupta S S. Modelling of Corex process for optimization o{ operational parameters. Ironmaleing Steel-making, 2006, 33(1): 29
  • 7Gupta S K. Corex process utilisation of noncoking coal from India: Prospects and problems. J Mines Met Fuels, 2002, 50(7): 300
  • 8Lee C M, Fruehan R J. Phosphorus equilibrium between hot metal and slag. Ironmaking Steelmaking, 2005, 32(6) : 503
  • 9Gudenau H W, Fang J, Hirata T. Fluidized bed reduction as the prestep of smelting reduction. Steel Res, 1989, 60(3) : 138
  • 10Hardie G J, Taylor I F. Adaptation of injection technology for the Hismelt process//Proceedings of the Savard Lee International Symposium on Bath Smelting. Montreal, 1992:623

共引文献69