摘要 以京沪高速铁路韩庄运河特大桥混凝土连续梁桥的施工为例,阐述了支架法分段现浇施工方案及其施工组织设计,并详细介绍了支架设计方案、施工过程有限元力学分析及其技术要求。理论分析表明,施工过程安全可靠、可控。成功的实践进一步表明,采用支架法分段现浇施工技术完成混凝土连续梁桥的施工,技术可行,经济效果显著,施工方法可供同类型工程施工参考。 Based on the construction of continuous concrete beams of Hanzhuang canal bridge (60 + 100 + 60) m on Beijing-Shanghai high speed railway, the segmental support on-site cast plan and its construction organization design are illus- trated, and the support design solution, finite element mechanics analysis of the construction processes and technique re- quirement are explained in detail. Theory analysis indicates that the construction process is safe, reliable and controllable based on the FEM mechanics analysis. Successful construction of the bridge shows segmental support on site cast for con- crete continuous beam bridge techniques is feasible in technological and economical term. The method can be a reference for similar construction projects.
作者 李志荣
出处 《铁道建筑技术》 2011年第12期33-37,共5页 Railway Construction Technology
关键词 高速铁路 混凝土连续梁桥 施工组织 支架设计方案 high speed railway continuous concrete beam bridge construction organization support design
  • 相关文献

参考文献1

二级参考文献3

  • 1范立础.桥梁工程[M].北京:人民交通出版社,2001..
  • 2中华人民共和国铁道部.TB10002.3-2005铁路桥涵钢筋混凝土和预应力混凝土结构设计规范[S].北京:中国铁道出版社,2005.
  • 3铁道部第三工程局.铁路桥涵施工技术手册[M].北京:中国铁道出版社,2003.

共引文献4

同被引文献22

引证文献5

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部