摘要
针对西安地铁二号线一期工程供电系统工程现场情况,施工方制定的接口管理方案经过工程实施过程的检验,证明其在施工管理过程中,对工程的质量、进度、安全、成本、环保等的控制发挥了重要作用。
This essay focus on the construction site of the power supply system of the 2. Line of Xi'an metro in the first project phase, in which the scheme of interface management, formulated by the building contractor, past the test of the actual operation and proved that it functioned effectively in controlling the quality, speed o fprogress, safety, cost and environment during the construction.