4[2]Liu Dacheng, Zheng Li, Li Zhizhong. Assesment of present remote monitor system and the future trends. Joint International Conference of IE&EM'2002 and IceCE'2002,Sept., 2002.
5[9]Liu Dacheng, Zhang Bopeng, Xu Jiaqiu, et al. Enterprise agility measure and information integration measure for agile manufacturing. in: CIRP International Symposium,Advanced Design And Manufacturing In The Global Manufacturing Era(Volume 1). HongKong: City University of HongKong, 1997.461-467.
6[10]Liu Dacheng, Zheng Li, Li Zhizhong, et al. Agile supply system oriented virtual manufacturing. In: Proceeding of the 4th International Conference on Frontiers of Design and Manufacturing. Hangzhou: 2000. 108-111.
7[11]Zihang B P, Liu D C, Sbu S D, et al. Investigation on goal establishing, orderbuilding and skill transfer issues in manufacturing. in: Proceeding of International Workshop on Automative Manufacturing Science and Technology.Shanghai: 1996. 21-25.
8[13]Ren C.Luo,Tse Min Chen. Development of a Multibehavior-Based Mobile Robot for Remote Supervisory Control Through the Internet. IEEE/ASME TRANSACTIONS ON MECHATRONICS, VOL.5,NO.4,DECRMBER 2000:376-385.