期刊文献+

钢管混凝土柱-钢梁穿筋节点低周反复荷载下受力性能 被引量:1

Mechanical behavior of concrete-filled steel tube column-steel beam joints with penetration steel bars under low cyclic loading
下载PDF
导出
摘要 对8个圆钢管混凝土柱-钢梁节点进行低周反复加载试验,其中6个节点设置了穿透钢筋,另外2个节点未设穿透钢筋,对节点的破坏位置和形态进行了分析,研究其抗弯承载力、延性和耗能能力.试验结果表明:节点穿筋将大部分弯矩直接传递给核心混凝土,降低了钢管的拉应力,显著提高了直接焊接钢梁节点的受力性能.穿筋节点具有较高的抗弯承载力、良好的延性和耗能能力,而未穿筋节点的抗弯承载力低,延性和耗能能力差. 8 Concrete-filled circular steel tube column-steel beam joints,6 joints with penetration steel bars and the other 2 joints without penetration steel bars,were tested under low cyclic loading.The failure position and shape of joints were researched.The flexural capacity,ductility and energy dissipation were analyzed.The experimental results indicate that penetration steel bars can transfer the most moment into core concrete,and decrease the tension stress in steel tube,thus obviously improve the mechanical behavior of joints on which steel beams are directly welded to the steel tube.The joints with penetration steel bars have high flexural capacity,excellent ductility and energy dissipation,and joints without penetration steel bars have low flexural capacity,poor ductility and energy dissipation.
出处 《大连理工大学学报》 EI CAS CSCD 北大核心 2012年第1期54-59,共6页 Journal of Dalian University of Technology
关键词 钢管混凝土柱 钢梁 穿筋节点 低周反复荷载 concrete-filled steel tube column steel beam joints with penetration steel bars low cyclic loading
  • 相关文献

参考文献4

  • 1华北电力设计院.DL/T5085-1999钢-混凝土组合结构设计规程[S].北京:中国电力出版社,1999.
  • 2SCHNEIDER S, ALOSTAZ Y. Experimental behavior of connections to concrete filled steel tubes [J]. Journal of Constructional Steel Research, 1998, 45(3) :321-352.
  • 3BEUTEL J, THAMBIRATNAM D, PERERA N. Cyclic behavior of concrete filled steel tubular column to steel beam connections [J]. Journal of Engineering Structures, 2002, 24(1):29-38.
  • 4张素梅,张大旭.钢管混凝土柱与梁节点荷载-位移滞回曲线理论分析[J].哈尔滨建筑大学学报,2001,34(4):1-6. 被引量:15

二级参考文献2

共引文献17

同被引文献20

  • 1李斌,高春彦.矩形钢管混凝土框架节点抗震性能试验研究[J].工程力学,2007,24(z2):177-181. 被引量:20
  • 2王文达,韩林海,陶忠.钢管混凝土柱-钢梁平面框架抗震性能的试验研究[J].建筑结构学报,2006,27(3):48-58. 被引量:65
  • 3聂建国,樊健生.广义组合结构及其发展展望[J].建筑结构学报,2006,27(6):1-8. 被引量:56
  • 4Ferdinand Tschemmernegg.The non-linear behavior of compos-ite Joint[s J].Journal of Constructional Steel Research,1992,21:59-70.
  • 5Ben Kata,Manom Kimurat Hidehiko Ohta,Naoki Mizutani.Connection of beam flange to concrete filled tubular colunm[A].Com-posite Construction in Steel and Concrete[C].1993:528-538.
  • 6Stephen P Schneider,Yousef M.Afostaz.Experimental behavior ofconnections to concrete-filled steel tubes[J].Journal of ConstructionalSteel Research,1998,45(3):321-352.
  • 7Shih-Wei Peng,James M.Ricles,Le Wu Lu.Full-scale testing ofseismically resistant moment connections for concrete filled tube column toWF beam hybrid systems[A].Composite and Hybrid Structures[C].2000:591-598.
  • 8Ahmed Eiremally,Atorod Azizinamini.Experimental behavior ofsteel beam to CFT column connection[s J].Journal of Constructional SteelResearch,2001,57:1099-1119.
  • 9Atorod Azizinamini,Stephen P.Schneidar,Moment ConnectionsTo Circular Concrete Filled Steel Tube Columns[J].Journal of StructuralEngineering,ASCE,2004(2):213-222.
  • 10Yousef M Alostaz,Stephen P.Schneider.Analytical Behavior ofConnections to Concrete-filled Steel Tubes[J].Journal of 122,Constnt-clional Steel Research,1996,40(2):95-127.

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部