期刊文献+

汕头港广澳港区防波堤工程波浪输沙及对濠江河口影响研究 被引量:3

Longshore sediment transport due to Guang'ao breakwater project of Shantou port and its effect on Haojiang estuary
下载PDF
导出
摘要 依据外海1 a期波浪观测资料,采用沿岸输沙公式及波浪数学模型方法对海湾内波浪沿岸输沙及岸线变形情况进行研究。计算结果表明,防波堤工程实施后,改变了濠江河口附近原有波浪动力条件和净输沙方向,西侧岬湾两头将发生淤积,岬湾中部发生侵蚀,约5 a后,岸线将会与河口西侧的两个小岛相连,形成连岛沙堤。 Based on one-year wave observations off the coast,this paper studies the longshore transport rate of sediment and coastline deformation of the gulf by a joint method of formula and wave mathematical model.Calculation results show that the wave dynamic condition and sediment transport direction are changed nearby Haojiang estuary after implement of the project,and as a result,siltation occurs at two ends of the bay to the west of the estuary and erosion in the middle of that;About 5 years later,a sand barrier will form between the coastline and the two islands on the west side.
出处 《水运工程》 北大核心 2012年第1期6-11,共6页 Port & Waterway Engineering
关键词 防波堤 破碎波 沿岸输沙率 岸线变形 breakwater breaking wave longshore sediment transport rate coastline deformation
  • 相关文献

参考文献5

  • 1中交第二航务工程勘察设计院有限公司.汕头港广澳港区防波堤工程初步设计[R].武汉:中交第二航务工程勘察设计院有限公司.2009.
  • 2US Army Corps of Engineers. Coastal Engineering Manual[M]. Washington D C, USA: US Government Printing Office, 2003.
  • 3JTJ 213-1998. 海港水文规范[S].
  • 4中交第一航务工程勘察设计院有限公司.汕头港总体规划补充报告[R].天津:中交第一航务工程勘察设计院有限公司,2008.
  • 5天津大学建筑工程学院.汕头港广澳港区防波堤工程波浪输沙对濠江河口影响研究[R].天津:天津大学建筑工程学院,2009.

共引文献85

同被引文献35

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部