根据实际现场工程情况,对脱硫系统电气接线、容量选择、脱硫保安电源、直流系统以及UPS系统等几个方面进行详细的讨论和分析。从提高运行可靠性角度出发,为电气设计的优化提出建议。
This paper discusses and analyzes desulphurization system electrical wiring,capacity selection,desulphurization emergency power supply,direct current system and UPS system according to the on-site engineering situation.The proposals on optimization of electrical design are put forward to improve the operation reliability.
出处
《浙江电力》
2012年第1期45-48,共4页
Zhejiang Electric Power
关键词
火电机组
烟气脱硫
改造
电气设计
探讨
thermal power units
flue gas desulphurization
transformation
electrical design
discussion