杨房沟水电站拱坝坝肩抗力体稳定性分析

Stability analysis of arch dam abutment resisting mass in Yangfang hydropower station
下载PDF
导出
摘要 杨房沟水电站拱坝两岸Ⅳ、Ⅴ级结构面发育,特别是平行拱轴力的侧向结构面连通性较好,对坝肩抗滑稳定不利。本文分析两岸坝肩抗力体内可能组合块体,研究块体结构面的力学参数,查明其连通率,评价对坝肩抗力体的稳定影响。 The IV,V level structural plane on both sides of the arch dam in Yangfang hydropower station,especially the lateral structural plane of parallel arch axis force has good connectivity,which is harmful to anti-slide stability of dam abutment.In this paper,possible combination of blocks in dam abutment resisting mass is analysed,mechanical parameters of the block structural plane is studied,the connecting rate is investigated and its influence on dam abutment resisting mass is evaluated.
出处 《福建建筑》 2012年第1期84-87,共4页 Fujian Architecture & Construction
关键词 拱坝 结构面 抗力体 稳定性分析 Arch Dam Structural Plane Resisting Mass Stability Analysis
  • 相关文献

参考文献4

  • 1水利电力部水利水电规划设计院.水利水电工程地质手册[M].北京:水利电力出版社,1982.
  • 2本书编审委员会.中国水力发电工程·工程地质卷.北京:中国电力出版社,2000.
  • 3GB50287-2006,水力发电工程地质勘察规范[S].
  • 4福建华东岩土公司.杨房沟水电站可研阶段工程地质勘察报告[R].2011.