4CHOU C C, CHANG P L. Modeling and Analysis of Labor Cost Estimation for Shipbuilding: The Case of China Shipbuilding Corporation[J]. Journal of Ship Production,2001,17(2):92-96.
5HOWARD B. Study of the causes of man-hour variance of naval shipyard work standards[J]. Journal of Ship Production, 1990, 6 (4): 268-272.
6LIU B,JIANG Z H; The Man-hour Estimation Models & Its Comparison of Interim Products Assembly for Shipbuilding[J].International Journal of Operations Research,2005,2(1):9-14.
7[7]Sensitivity of executive pay to accounting performance measures in all-equity firms,Raghavan J.Iyengar,et al,Accounting and Finance 45(2005).
8[8]Performance measure congruity and the balance scorecard.Jorg Budde,Journal of Accounfng Research vol.45 No.3 June 2007
9高介祜.现代造船工程[M].哈尔滨:哈尔滨工程大学出版社,1998..
10Sormaz,Dusan N,Khoshnevis,Behrokh.Generation of alternative process plans in integrated manufacturing systems[J].Journal of Intelligent Manufaeturing,2003,14(6):509 -526.