摘要
响水涧抽水蓄能电站上水库帷幕灌浆试验从技术上论证了采用水泥灌浆方案的可行性。对帷幕灌浆的设计参数进行了实地验证,总结了一套合理的施工工序及工艺,选择了适宜的灌浆材料和最优的灌浆水灰比,为确保帷幕灌浆质量起到了指导性作用。
Experiment study on curtain grouting for upper reservoir at Xiangshuijian pumped storage power station technically demonstrates feasibility of cement grouting option.Design parameters of curtain grouting are verified in site.A series of proper construction sequences and techniques are summarized and grouting materials and best grouting water cement ratio are selected to ensure curtain grouting quality.
出处
《四川水力发电》
2011年第A02期212-215,共4页
Sichuan Hydropower
关键词
响水涧抽水蓄能电站
帷幕灌浆试验
成果分析
Xiangshuijian pumped storage power station
curtain grouting test