期刊文献+

Calculus of the Railway Vertical Stiffness Depending on the Base Plate Stiffness and the Ballast for High Speed Railways

Calculus of the Railway Vertical Stiffness Depending on the Base Plate Stiffness and the Ballast for High Speed Railways
下载PDF
导出
摘要 The study aims to determine a mathematical formula that correlates the vertical stiffness of the principal elements of a high speed railway. To do this, beginning on the traditional formulations, a new mathematical model has been proposed, and has been verified and confirmed with the real information of high speed railways. Finally, there has been obtained a simple expression that correlates simply the vertical stiffness of the railway with the vertical stiffness of the elements that compound it, essentially with the base plate and the ballast system set. On the other hand, also the accuracy of the model has been verified to select the stiffness of the base plate and the ballast system depending on one of this stiffness and the total vertical stiffness that it is wanted. With this simplified formula, it is possible to optimize the vertical stiffness of the railway to obtain the best behavior in each zone and to reduce the final cost of the use of the via, taking in consideration the energy needed to move the trains, the maintenance cost, the useful life, etc.. The process to optimize the railway stiffness in each point depends on the vertical stiffness of the ballast and the sub-ballast, and it is possible to use different plate bases with different stiffness to obtain the optimal stiffness that has been previously obtained with a cost and maintenance analysis.
出处 《Journal of Mechanics Engineering and Automation》 2011年第6期450-454,共5页 机械工程与自动化(英文版)
关键词 RAILWAY WAY STIFFNESS BALLAST PLATFORM base plate. 竖向刚度 高速铁路 镇流器 垂直 底板 维护成本 演算 数学公式
  • 相关文献

参考文献6

  • 1A.L.-Pita, P.F. Teixeira, C. Casas, L. Ubalde, F. Robuste, Evolution of track geometric quality in high-speed lines:Ten years experience of the Madrid-Seville line, in: Proceedings of the Institution of Mechanical Engineers: Part F, Journal of Rail and Rapid Transit 221 (2) (2007) 147-155.
  • 2P.F. Texeira, A.L.-Pita, Nuevos Criterios para Reducir los Costes de Mantenimiento de Lineas de Alta Velocidad, Congreso de Ingenieria del Transporte, Santander, 2002.
  • 3P. Lv, W. Pang, L.J. Meng, L.Q. Gao, Numercial analysis of geogrid and plastic drainage plate used in existed railway alteration project, Geosynthetics in Civil and Environmental Engineering: Part 9, 2009, pp. 673-676.
  • 4C. Gonz~ilez-Nicieza, A. ,/dvarez-Fem~indez, A. Men6ndez-Diaz, Failure analysis of concrete sleepers in heavy haul railway tracks, Engineering Failure Analysis 15 (2008) 90-117.
  • 5E.T. Selig, D. Li, Track modulus: Its meaning and factors influencing it, Transportation Research Recorder 1470 (1994) 47-54.
  • 6D. Uzarski, S. McNeil, Technologies for planning railroad track maintenance and renewal, Journal of Transportation Engineering 120 (1994) 807-820.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部