期刊文献+

抄道沟水库侧槽式溢洪道除险加固设计 被引量:3

Design Research on Danger Control and Reinforcement Project of Side Channel Spillway of Chaodaogou Reservoir
下载PDF
导出
摘要 侧槽式溢洪道除险加固工程设计不同于新建工程设计,是新建工程设计的一个逆过程。通过对已有建筑物尺寸的复核,结合现场实际地形情况,在尽可能不改变原有建筑物结构型式的前提下,确定合适的加固方案,以解决现有工程存在的问题。该文以抄道沟水库溢洪道加固设计为例,简要介绍侧槽式溢洪道加固设计。 Different from the new project design,the design of side channel spillway used on danger control and reinforcement project is a inverse process of a new designed project.Based on the size review of the existing building,combined with the actual terrain scene,giving the proper reinforcement scheme to slove problems in the existing project under the permise of unchanging the structure of the former builing as much as possible.Take the reinforcement project of spillway of Chaodaogou seservoir as an example,the article introduces the design of the reinforcement project of side channel spillway briefly.
作者 牛利凯
出处 《水科学与工程技术》 2011年第6期43-45,共3页 Water Sciences and Engineering Technology
关键词 侧槽末端水深 临界水深 临界底坡 水面线 water depth in end side channel spillway critical water depth critical bed slope water surface line
  • 相关文献

参考文献6

二级参考文献3

  • 1水利电力部水利水电规划设计院.水工设计手册[M].北京:水利电力出版社.1987.
  • 2江西省水利科学研究所.无闸溢洪道水利设计[M].北京:水利出版社.1981.
  • 3韩立.侧槽溢洪道的水力计算和设计.陕西水利,1973,(02):6-16.

共引文献102

同被引文献12

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部