期刊文献+

永定桥碾压混凝土重力坝孔口应力三维有限元分析

Three-dimensional Finite Element Analysis on Outlet Stress of the Roller Compacted Concrete Gravity Dam in Yongding Bridge
下载PDF
导出
摘要 应用ANSYS软件对永定桥碾压混凝土重力坝4#坝段进行拟静力计算,分析了泄洪中孔在正常蓄水位和校核洪水位工况下的应力分布情况,重点分析了在地震作用下的应力分布情况,得出泄洪中孔在地震作用下的应力分布规律基本上与正常蓄水位的应力分布规律一致,量值略大,为泄洪中孔的配筋及结构优化提供了依据. ANSYS software is applied to carry out pseuto-static calculation of 4# dam section of roller compacted concrete gravity dam in Yongding bridge.The stress distribution of flood discharge middle outlet under the working conditions of normal water level and check flood level is analyzed,espesially that under earthquake action.The results show that the stress distribution under earthquake action is the same as that under normal water level,and the stress is slightly larger.This can provide the basis for reinforcement and structural optimization.
出处 《华北水利水电学院学报》 2011年第6期42-44,共3页 North China Institute of Water Conservancy and Hydroelectric Power
关键词 重力坝 拟静力 泄洪中孔 正常蓄水位 地震作用 gravity dam pseudo-static flood discharge middle outlet normal water level earthquake action
  • 相关文献

参考文献9

二级参考文献14

  • 1李长青.关河水库溢洪道闸室稳定分析及抗震验算[J].吉林水利,2007(12):35-37. 被引量:3
  • 2刘如山,胡少卿,石宏彬.地下结构抗震计算中拟静力法的地震荷载施加方法研究[J].岩土工程学报,2007,29(2):237-242. 被引量:106
  • 3包世华.结构动力学[M].武汉:武汉理工大学出版社,2004.
  • 4中华人民共和国水利部.SL253--2000溢洪道设计规范[S].北京:中国水利水电出版社,2000.
  • 5陈德亮,陈宝华,张世儒.水闸[M].北京:中国水利水电出版社,2002.
  • 6DL5108—1999.混凝土重力坝设计规范[S].[S].,..
  • 7DL5073-2000.水工建筑物抗震设计规范[S].[S].,..
  • 8DL5077-1997.水工建筑物荷载设计规范[S].[S].,..
  • 9DL5073—1997.水工建筑物抗震设计规范[S].[S].,..
  • 10DL5077—1997.水工建筑物荷载设计规范[S].[S].,..

共引文献38

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部