摘要
通过对桥梁桩基础抬桩加固的受力分析,研究通过传统的增补桩加固法无法有效地解决新旧桩之间应力转换的问题,提出利用预应力抬桩预压技术来有效的解决应力转换的问题。并介绍一种操作方便、工期短的施工方法,达到有效方便修复桥墩桩基础承载力不足的目的。
In this paper,based on the force analysis of bridge pile foundation in the process of lifting pile reinforcement,a pre-compression lifting piles technology was put forward to resolve effectively the problem of stress transforms,and a construction method together with its characteristic of convenience and speediness in operation and time limit respectively were introduced to strengthening the bridge pier pile foundations of insufficient bearing capacity.
出处
《福建建设科技》
2012年第1期12-13,61,共3页
Fujian Construction Science & Technology
关键词
桥墩桩基础
抬桩加固
预压技术
Pile foundation of bridge pier
Lifting pile reinforcement
Pre-compression technology