期刊文献+

桥墩桩基础预压抬桩加固技术研究 被引量:3

Research of pre-compression lifting pile technology in bridge pier pile foundations
下载PDF
导出
摘要 通过对桥梁桩基础抬桩加固的受力分析,研究通过传统的增补桩加固法无法有效地解决新旧桩之间应力转换的问题,提出利用预应力抬桩预压技术来有效的解决应力转换的问题。并介绍一种操作方便、工期短的施工方法,达到有效方便修复桥墩桩基础承载力不足的目的。 In this paper,based on the force analysis of bridge pile foundation in the process of lifting pile reinforcement,a pre-compression lifting piles technology was put forward to resolve effectively the problem of stress transforms,and a construction method together with its characteristic of convenience and speediness in operation and time limit respectively were introduced to strengthening the bridge pier pile foundations of insufficient bearing capacity.
出处 《福建建设科技》 2012年第1期12-13,61,共3页 Fujian Construction Science & Technology
关键词 桥墩桩基础 抬桩加固 预压技术 Pile foundation of bridge pier Lifting pile reinforcement Pre-compression technology
  • 相关文献

参考文献1

  • 1陈凡,徐天平,朱光裕等.JGJ106-2003建筑基桩检测技术规范[S].北京:中国建筑工业出版社,2004.

共引文献3

同被引文献17

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部