期刊文献+

大渡河梯级水电开发方式科学优化浅析 被引量:6

Analysis of Optimizing Development Model of Cascade Hydropower in Dadu River
下载PDF
导出
摘要 在大渡河干流水电规划调整的基础上,为进一步合理利用水力资源、减少淹没损失、降低开发难度,研究了水电梯级开发方式,确定了大渡河金川至丹巴河段采用安宁+巴底+丹巴三级开发,深溪沟(以下)至沙坪河段采用枕头坝一级+枕头坝二级+沙坪一级+沙坪二级四级开发的方案,使得原规划的巴底、丹巴、枕头坝、沙坪梯级的经济指标有所降低、投资增加,但使原本认为开发难度极大、实施非常困难的梯级极大增加了可行性;在开发方式研究过程中,秉承了合理开发利用的理念,不单纯追求经济效益,尽量避免或减少对环境的不利影响、减少移民搬迁,以便更为科学合理地利用水力资源。 Based on the hydropower planning adjustment of Daduhe main river,development model of cascade hydropower is discussed to further rational use of water resources,reduce inundation loss and development difficulty.The Jinchuan~Danba reach of Dadu river is developed by Aning,Badi,Danba hydropower stations;and the Shenxigou~Shaping reach of Dadu river is developed by Zhentouba I,Zhentouba II,Shaping I,Shaping II hydropower stations,which makes the economic indicators reducing and investment increasing,enhance the feasibility of cascade hydropower with difficulty of development and hard implementation.The important spirits are incarnated by the optimizing Dadu river cascade hydropower development model: rational exploitation,not seeking economic benefit only,more helpful to environment,reducing immigrant,which makes water resource utilizing more scientifically.
出处 《水电能源科学》 北大核心 2012年第2期155-158,共4页 Water Resources and Power
关键词 开发方式 大渡河 巴底 丹巴 安宁 枕头坝 沙坪 科学发展观 development model Dadu river Zhentouba Shaping Badi Danba Anning Zhentouba Shaping scientific view of development
  • 相关文献

参考文献4

二级参考文献8

共引文献9

同被引文献33

  • 1张细兵,卢金友,范北林,朱永辉.唐家山堰塞湖溃坝洪水演进及下泄过程复演[J].人民长江,2008,39(22):76-78. 被引量:14
  • 2LIU Ning1, ZHANG JianXin2, LIN Wei3, CHENG WuYI4 & CHEN ZuYu5 1 Ministry of Water Resources of the People’s Republic of China, Beijing 100053, China,2 Bureau of Hydrology of the Ministry of Water Resources of the People’s Republic of China, Beijing 100053, China,3 Sichuan Hydrographic and Water Resources Survey Bureau,Chengdu 610031, China,4 HydroChina Chengdu Engineering Corporation, Chengdu 610072, China,5 China Institute of Water Resources and Hydropower Research, Beijing 100044, China.Draining Tangjiashan Barrier Lake after Wenchuan Earthquake and the flood propagation after the dam break[J].Science China(Technological Sciences),2009,52(4):801-805. 被引量:33
  • 3陈刚,马光文,付兴友,唐荣斌.大渡河干流水电开发的战略地位及作用分析[J].水力发电,2005,31(12):4-7. 被引量:7
  • 4付兴友.关于加快我国水力资源开发的政策性建议[J].水力发电,2007,33(3):70-73. 被引量:3
  • 5付兴友.用科学发展观指导大渡河水电开发[J].四川水力发电,2007,26(2):75-79. 被引量:2
  • 6王煌,周买春,刘远.广东省小水电水资源开发配置与生态环境的关系[A].全国水资源合理配置与优化调度技术专刊[C].西安:流域水循环模拟与调控国家重点实验室,中国水利技术信息中心,2012,33-36.
  • 7Dondi P, Bayourni D, Haederli C,et al. Network In- tegration of Distributed Power Generation[J]. Jour- nal of Power Sources, 2002,106 (1-2) : 1-9.
  • 8SuEi S, Dragievi T, Capuder T, et al. Economic Dis- patch of Virtual Power Plants in an Event-driven Service-oriented Framework Using Standards-based Communications [J]. Electric Power Systems Re- search,2011,81(12):2 108-2 119.
  • 9Chicco G, Mancarella P. Distributed Multi-generation: A Comprehensive View[J]. Renewable and Sustainable Energy Reviews,2009,13(3) ..535-551.
  • 10Wille-Haussmann B, Erge T,Wittwer C. Decentralised Optimisation of Cogeneration in Virtual Power Plants[J]. Solar Energy, 2010,84 (4) : 604-611.

引证文献6

二级引证文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部