摘要 提出一体化检修计划优化管理系统。该系统对检修计划进行评估、优化、基态、静态、暂态和动态多维度一体化安全校核,通过基于电网运行经验专家库、评估指标分析、静态暂态动态校核等进行全过程检修计划优化辅助决策。检修计划优化调整贯穿整个编制过程。实现了年度、月度、日前多周期及各周期多时段的检修计划优化管理,通过对电网日前及多未来模型的本地存储管理,在计划优化校核过程中自动匹配应用当前及未来多个网络模型。 Integrative optimal management system of outage schedule is proposed in this paper.This system provides assessment,optimization,and multi-dimensional and integrative security correction including static,transient and dynamic check of outage schedule.The system realizes whole process outage schedule optimizing assistant operation decision through experience and expertise database,analysis of evaluation index,multi-dimensional security check.Optimization and adjustment of outage schedule exists in the whole process.The system realizes multi period optimization management of daily,monthly and yearly outage schedule.And the system auto-matches day-ahead and multiple future models in the process of check and optimization through local store management of day-ahead and multiple future models.
出处 《江苏电机工程》 2012年第1期1-4,共4页 Jiangsu Electrical Engineering
基金 "十一.五"国家科技支撑计划重大项目(2008BAA13B06)
关键词 检修计划优化调整 负荷供应充裕度 发电容量损失 安全校核 多模型应用 outage schedule optimal management load supply adequacy generation loss security check multiple model application
  • 相关文献

参考文献5

二级参考文献30

  • 1冯永青,张伯明,吴文传,李尹,孙宏斌,林鄂华.电力市场发电机组检修计划的快速算法[J].电力系统自动化,2004,28(16):41-44. 被引量:37
  • 2张粒子,黄弦超,舒隽,陶文斌.配电网检修计划优化模型设计[J].电力系统自动化,2005,29(21):50-52. 被引量:38
  • 3吴际舜.电力系统静态安全分析[M].上海:上海交通大学出版社,1984..
  • 4Transmission Transfer Capability. A Reference Document for Calculating and Reporting the Electric Power Transmission Capability of Interconnected Electric Systems[Z]. North American Electric Reliability Council, 1995.
  • 5Available Transfer Capability Definition and Determination: A Reference Document Prepared by TTC Task Force[Z]. North American Electric Council, 1996.
  • 6Sauer P W. Technical Challenges of Computing Available Transfer Capability (ATC) in Electric Power Systems[A].Proceeding of HICSS-30 Conference.1977.
  • 7Wood A J, Wollenberg B F. Power Generation, Operation, and Control,Second Edition[M]. New York: John Wiley & Sons,1996.
  • 8LEOU R C.A flexible unit maintenance scheduling considering uncertainties.IEEE Trans on Power Systems,2001,16 (3):552-559.
  • 9DA SILVA E L,SCHILLING M T,RAFAEL M C.Generation maintenance scheduling considering transmission constraints.IEEE Trans on Power Systems,2000,15(2):838-843.
  • 10ZURN H H,QINTANA V H.Generator maintenance scheduling via successive approximation dynamic programming.IEEE Trans on Power Apparatus and Systems,1975,94 (2):665-671.