城市隧道施工风险指数法评估 被引量:4

Risk Index Assessment of Urban Tunnel Construction
下载PDF
导出
摘要 城市隧道工程具有工程地质条件差、地面建筑结构变形影响敏感、地下管网错综复杂、管理难度大、潜在风险因素多等特点,极易引起塌方、地面沉陷、上部建筑结构开裂乃至倒塌等工程事故,施工风险大,需要进行专业风险评估分析.通过建立城市隧道施工力学模型,设计正交仿真试验方案,计算隧道施工地表沉降值,并采用层次分析理论计算隧道施工各因素水平对风险综合指标的影响权重,在此基础上针对胶州湾隧道接线工程,给出不同工况下隧道施工风险指数值及风险等级.工程实践表明,该风险评估方法对隧道施工风险管理具有重要的理论指导意义和实践应用价值. Urban tunnel engineering has the characteristics including poor engineering geological condition,sensitive to displacement transformation of ground building structure,complicated underground pipeline network,complex construction managements,high degree of difficulties,and more potential risk factors,which are so easy to cause collapses,ground-surface settlements,cracks on upper building structure,and the collapse engineering accidents so that it a risk management analysis.By building the urban tunnel construction mechanical model and designing the orthogonal simulating test scheme,the ground settlement value of tunnel construction is calculated by using the orthogonal simulating test hierarchy theory,the influence weight of complex risk index at every factor level in tunnel construction is calculated.The tunnel construction risk value and the risk ranking of each working condition combined with Jiaozhou Bay sub-sea tunnel are obtained.
出处 《北京工业大学学报》 EI CAS CSCD 北大核心 2012年第2期250-256,共7页 Journal of Beijing University of Technology
基金 国家自然科学基金项目(No.51009086) 山东省中青年科学家科研奖励基金(No.2010BSE06063)
关键词 城市隧道 风险指数 正交仿真试验 层次分析法 urban tunnel risk index simulating orthogonal experiment analytical hierarchy process influence weight matrix
  • 相关文献

参考文献10

  • 1YAMAGUCHI I, YAMAAKI Y. KIRILANI. Study of Ground-TunnelInteraetions of Four Shield Tunnels Driven in Close Proximity, in Relation to Design and Construction of Parallel Shield Tunnels [ J ]. Tunneling and Underground Space Technology. 1998 , 13 (3) : 289-304.
  • 2ESKESEN S D, TENGBORG P, KANPMANN J, et al. guidelines for tunneling risk management: International Tunneling Assocition, Working Group No. 2 [ J ]. Tumelling and Underground Space Technology, 2004, 19 (3) : 217-237.
  • 3陈龙,黄宏伟.软土盾构隧道施工期风险损失分析[J].地下空间与工程学报,2006,2(1):74-78. 被引量:33
  • 4侯艳娟,张顶立.浅埋大跨隧道穿越复杂建筑物安全风险分析及评估[J].岩石力学与工程学报,2007,26(S2):3718-3726. 被引量:48
  • 5BURLAND, J B, STANDING J R, JARDINE F M. Building Response to Tunnelling, case studies from construction of the Jubilee Line Extension, London Volume 1 : PROJECT AND METHODS [ M ]. London. Thomas Telford Publishing. 2001 : 509-545.
  • 6YOO C, KIM J H. A web-based tunneling-induced building/utility damage assessment system : TURISK [ J ]. Tunneling and Underground Space Technology. 2003, 18 (5): 497-511.
  • 7陈杰金.下穿既有设施城市隧道施工风险管理与系统开发[D].长沙:中南大学土木建筑学院,2009.
  • 8MICHAEL PENNOCK J, YACOV H Y. Principles and guidelines for project risk management [ J ]. Systems Engineering. 2002, 5(2) : 89-108.
  • 9VERRUJT A, BOOKER J R. Surface settlements due todeformation of a tunnel in an elastic half plane [ J ]. Geotechnique, 1996, 46(4) : 753-756.
  • 10吴波.隧道施工安全风险管理研究与实务[M].北京:中国铁道出版社,2007:35-40.

二级参考文献15

共引文献79

同被引文献27

引证文献4

二级引证文献51

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部