摘要
基础是油田场站施工的一个关键性部位。叙述了超低渗透庆二联合站集输系统的2具5 000 m3环墙式钢储罐的施工工序以及各工序中的关键点,为油气田场站建设提供参考。
The foundation is a key part of the field station construction.This paper described the construction process of two 5 000 m 3 steel ring wall tanks in the ultra-low permeability Qing Er-lian gathering system and the key points of the process,it will provide a reference for the construction of oil and gas fields station.
出处
《能源与节能》
2011年第9期70-70,89,共2页
Energy and Energy Conservation
关键词
地基探墓
素土回填压实
灰土回填压实
混凝土垫层
tomb of the foundation exploration
prime soil backfill compaction
dust backfill compaction
concrete pads