期刊文献+

全球气候变化下的大坝运行和管理

Title: Design study on construction scheme of water level regulation project for Shuikou downstream hydro-junction
下载PDF
导出
摘要 当前,全球气候变化问题是人类迄今为止面临的规模最大、范围最广、影响最为深远的挑战之一,也是影响未来世界经济和社会发展、重构全球政治和经济格局的最重要因素之一。近百年来,世界年平均气温升高了0.4℃~0.8℃,气候变化导致海平面上升,对海洋岛国和大陆沿海地区造成重大负面影响, The main objective of water level regulation project for Shuikou downstream hydro-junction was to solve the problem of inadequacy of threshold depth of navigation structure and meet the requirements on the draft head of hy- dro-generator. By construction of downstream junction, the water level would reach 7.64 m while discharge is 308 m3/s. During operation of Shuikou hydropower plant, its available water head is limited. The comprehensive analysis showed that the navigation scheme was preferred to navigation and hydropower scheme.
出处 《大坝与安全》 2011年第5期3-6,10,共5页 Dam & Safety
关键词 水位治理工程 航电方案 航运方案 枢纽布置 效益分析 水口水电站坝下枢纽 water level regulation project navigation and hydropower scheme navigation scheme junction layout profit analysis Shuikou downstream hydro-junction
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部