期刊文献+

水泥混凝土路面错台分级方法 被引量:7

Faulting Evaluation Criteria of Cement Concrete Pavement
下载PDF
导出
摘要 结合重庆市水泥混凝土路面错台病害评价标准确定实例提出了一种基于路面行驶质量水平的错台量分级方法.首先选择2个典型的水泥混凝土路段,详细检测选定路段的错台量和局部平整度值(LRI);通过数值分析建立错台量与局部平整度指标之间的相关关系模型;最终由局部平整度与行驶质量水平间的关系建立基于行驶质量水平的错台量分级标准. Based on a case study of the joint faulting evaluation criteria in Chongqing,a new method was proposed for rating the joint faulting with a consideration of the level of ride quality.Two representative cement concrete pavement sections were chosen,then the joint faulting values and localized roughness index(LRI) of those pavement sections were detected.The relationship between joint faulting and LRI was revealed by the regression analysis.Then the joint faulting evaluation criteria were obtained based on the relationship between localized roughness and ride quality.
出处 《同济大学学报(自然科学版)》 EI CAS CSCD 北大核心 2012年第1期62-67,共6页 Journal of Tongji University:Natural Science
基金 交通部西部交通建设科技项目(2007 318 223 01-9)
关键词 道路工程 水泥混凝土路面 错台 局部平整度 评价标准 road engineering cement concrete pavement joint faulting localized roughness index evaluation criteria
  • 相关文献

参考文献12

  • 1赵茂才,张怀志,高伟,李秀凤.旧水泥混凝土路面错台对沥青加铺层产生反射裂缝的影响分析[J].公路交通科技,2008,25(3):8-12. 被引量:12
  • 2杨庆国,易志坚,刘占芳.水泥混凝土路面错台机理研究[J].重庆交通大学学报(自然科学版),2008,27(5):712-716. 被引量:7
  • 3周晓青,孙斌,陈长,孙立军.路面行驶质量水平评价标准方法研究[J].同济大学学报(自然科学版),2007,35(2):213-217. 被引量:4
  • 4Janoff Michael S. Pavement roughness and rideability[R]. [s. l. ]. National Cooperative Highway Research Program, 1985.
  • 5Janoff M S. Pavement roughness and rideability field evaluation [R]. [ s. l.]. National Cooperative Highway Research Program, 1988.
  • 6Sayers M W. On the calculation of international roughness index from longitudinal road profile [J]. Transportation Research Record, 1995,1501 : 1.
  • 7Gillespie D Thomas, Sayers W Michael, Segel Leonard. Calibration of response-type road roughness measuring systems [R]. Washington D C: National Cooperative Highway Research Program, 1980.
  • 8Sayers W Michael, Gillespie D Thomas, Paterson D William. Guidelines for conducting and calibrating road roughness measurements[R]. [s. l. ]. World Bank Technical, 1986.
  • 9Mark Martinez, Zhang Zhongjie. A new approach to indexing localized roughness of pavement[C/CD]//TRB 2010 Annual Meeting. Washinton D C: [s. n. ], 2010.
  • 10Olga Selezneva, Jiang Jane, Tayabji D Shiraz. Preliminary evaluation and analysis of LTPP faulting data-final report[R]. [s. l.]: U. S. Dept of Transportation, Turner-Fairbank Highway Research Center, 2000.

二级参考文献23

  • 1李峰,孙立军.沥青路面Top-Down开裂成因的有限元分析[J].公路交通科技,2006,23(6):1-4. 被引量:30
  • 2杨学良,刘伯莹.沥青路面温度场与结构耦合的有限元分析[J].公路交通科技,2006,23(11):1-4. 被引量:48
  • 3[3]RAY M.Recent Developments in the Design of Rigid Pavements in France,Proceeding of International Conference on Concrete Pavement Design,Indiana[M].USA:Purdue University,February,1977:15-17,265-278.
  • 4呼六福 蔚晓丹.国际平整度指数IRI专项研究[R].,1998..
  • 5Haas R,Hudson W R,Zaniewski J.Modern pavement management[M].Malabar:Krieger Publ Co,1994.
  • 6American Association of State Highway and Transportation Office.American Association of State Highway and Transportation Office guide for design of pavement structures[S].Washington D C:AASHTO,2003.
  • 7Sayers M W,Gillespie T D,Queiroz C A V.The international road roughness experiment:Establishing correlation and calibration standard for measurements[R].Washington D C:World Bank Technical Paper,1986.
  • 8Paterson W D O.International roughness index:Relationship to other measures of roughness and riding quality[R].Washington D C:AASHTO,1986.
  • 9林元生.智慧型检测车用于路面平整度的研究[D].台北:国立中央大学工学院,2004.
  • 10Lu J J,Zhu C,Pernia J.Performance evaluation of roughness measuring devices to measure ride number and international roughness index[R].Tallahassee:Florida Department of Transportation,2003.

共引文献19

同被引文献37

  • 1王晓嘉,高隽,王磊.激光三角法综述[J].仪器仪表学报,2004,25(z3):601-604. 被引量:167
  • 2俞永华,谢永利,杨晓华,张宏光,李新伟.路桥过渡段楔形柔性搭板处治技术[J].公路,2006,51(5):73-77. 被引量:9
  • 3MU F,VANDENBOSSCHE J M,GATTI K A,et al. An evaluation of JPCP faulting and transverse cracking models of the mechanistic-empirical pavement design guide[J]. Road Materials and Pavement Design, 2012,13 ( 1 ) : 128-141.
  • 4SOLMINIHAC H D, SALSILLI R,COVARRUBIAS J P,et al. Rehabilitation performance prediction models for concrete pavements[J]. Journal of the Transportation Research Board,1999(1684) :137-146.
  • 5TAYLOR P C, KOSMATKA S H, VOIGT G F. Integrated materials and eonstruction practices for concrete pavement: a state-of-the-practice manual[R]. Ames : Iowa State University, 2006.
  • 6JUNG J S,OWUSU-ANTWI E B,AN J H. Analytical procedures for evaluating factors that affect joint faulting for jointed plain concrete pavements using the long-term pavement performance database[J]. Canadian Journal of Civil Engineering,2006,33(10) :1279-1286.
  • 7SAGHAFI B, HASSANI A, NOORI R, et al. Artificial neural networks and regression analysis for predicting faulting in jointed concrete pavements considering base condition[J]. International Journal of Pavement Research and Technology, 2009,2 ( 1 ) : 20-25.
  • 8PIERCE I M, UHLMEYER J, Weston J, et al. Tenyear performance of dowel-bar retrofit application:application performance,and lessons learned[J]. Journal of the Transportation Research Board, 2003 (1853) : 83-91.
  • 9MILLER J S,BELLINGER W Y. Distress identification manual for the LTPP (fourth revised edition) [R]. Mclean : Federal Highway Administration, 2003.
  • 10SELEZNEVA O, JIANG J, TAYABJI S D. Preliminary evaluation and analysis of LTPP faulting data-final report [R]. Mclean : Federal Highway Administration, 2000.

引证文献7

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部