摘要
本文通过对长春热电厂储灰场水力冲填坝现场试验进行研究、对施工技术作了详细阐述.成果进行了分析,给出了施工参数。
The author carries out a study on field experiment of hydraulic fill dam for fly ash storefield of Changchun Thermal Power Plant. Detailedly presenting the construction technique, analysing the achievements and giving the construction parameters in the paper and just to proride for reference.
出处
《吉林水利》
2000年第1期21-24,共4页
Jilin Water Resources