摘要
通过广州地铁一号线四栋住宅大楼基础托换工程的方案选型,理论分析,设计与计算,简述了基础托换工程新方法的研究与应用。
Through the analysis,design and calculation of the foundation underpinning for four buildings over the No.1 subway Guangzhou,the research and application of the new underpinning way which has very good social and economical results are introduced。
出处
《岩土工程学报》
EI
CAS
CSCD
北大核心
2000年第1期95-100,共6页
Chinese Journal of Geotechnical Engineering
关键词
地下铁道
基础托换
转换层
住宅楼
subway,foundation underpinning,conversion storey,joints of new and old concrete