摘要
在当今的模块钻机建造项目中,合理的项目计划、有效的过程控制及严格的执行力是铸造精品项目不可或缺的重点要素。文章讲述了SZ36-1K模块钻机建造项目在实现目标控制的过程中所采取的方法和手段。
In today's construction of module drilling rig,reasonable project plan,effective process control and strict execution play essential roles in the process of doing a successful project.The story mainly describe the SZ36-1K module drilling rig construction project in achieving the aim of controlling the process of the method and means.
出处
《广东化工》
CAS
2012年第2期146-147,共2页
Guangdong Chemical Industry
关键词
目标控制
模块钻机
组织措施
管理措施
技术措施
经济措施
target control
modular drilling rig
organizational measures
management measures
technical measures
economic measures