摘要
根据板石沟矿多个矿区正在开采、且开采水平各不相同的现状,推断新发现矿体与老矿区开采复杂的时空关系,论证板石沟矿的各矿区进行总体规划的可行性,并提出可操作方案,既有利于各采区协调资源、组织生产,对矿山今后的可持续发展起到积极的推进作用。
Many ore bodies of Banshigou Iron Ore Mine are mined at the same time.The mining levels are different.The space-time relation between old ore bodies' mining and inferred reserves' mining is complicated.Facing this situation,the feasibility of an overall plan and its execution method is discussed.This overall plan is favorable for resource coordination exploitation and sustainable development of the mine.
出处
《矿业工程》
CAS
2012年第1期18-21,共4页
Mining Engineering
关键词
板石沟矿
多矿区
总体规划
Banshigou Iron Ore Mine
mining area having many ore bodies
overall plan